- erection of monolithic chimney 50 m - heating plant Praha 4 -
Krč
- repair ( replacement of protective liner) of monolithic chimney
- Technoplast a.s. Chropyně
- repair of chimney 80 m made of bricks after boiler crash in Heating
Plant - Praha Malešice
- repair of chimney 85 m made of moulded blocks for transition to
natural gas in Paramo a.s. Pardubice
- general overhaul of chimney 59 m of Sugar Factory a.s. Žatec,
supply and assembling of flue dust collector
- general overhaul of chimney 50 m in heating plant Praha - Zbraslav
due to transition to gas fuel
- erection of reinforced concrete monolithic chimney 45 m in Heating
Plant Ptraha - Ruzyně
- general overhaul of liner for transition to natural gas - gunuting,
reinforced concrete chimney 100 m made of
moulded blocks , Cement and Lime Works Prachovice
- general overhaul of protecting liner for transition to natural
gas - guniting, chimney 100 m made of bricks,
heating plant Pardubice
- erection of boiler house ( fuel :coal) including chimney - Soda
Water Plant Káraný
- erection of multi-flue free-standing Schidel chimneys for block
boiler houses (NVÚChomutov-Všehrdy), Central Oil
Fuelling Kralupy, University of Agriculture Praha - Suchdol, etc.)
- erection of three-component stainless steel chimneys for communal
and block boiler houses (Vorlina school in
Vlašim, Karlovy Lázně Praha 1, etc.)
- inserting stainless steel liners into existing chimneys made of
bricks before transition to gas (block boiler house in Velké Meziříčí
for OPBH Žďár n.S., etc.)
- repair and lenghtening of industrial chimneys made of bricks (Hospital
Děčín - 45 m)
- repair of outer mantel of reinforced concrete chimney Power Plant
Tisová
- wall concreting of 7 pieces of revision and checking shafts -
thermal conduit Praha - Mělník
- repair of reinforced concrete chimney 160 m , Praha - Malešice
- concreting of shaft 60 m - sewage disposal plant Vlašim
- concreting of shaft 30 m - water conduit Praha - Radotín
- execution of new flue ducts of boiler house and hesting plant
in Praha 6 - Heating plant Veleslavín
- reconstruction of chimney 101 m made of bricks in Heating Plant
Brno - Špitálka, new ceramic set-back liner
- repair of chimney 120 m made of moulded blocks type Monnoyer in
JIP Větřní, new set-back ceramic liner
- repair of chimney 100 m made of bricks for ČEZ,a.s. - Heating
Náchod, new ceramic liner
- reconstruction of chimneys K4 and K3 for ČEZ, a.s. - Heating Plant
Hodonín, new ceramic set-back liner
- repair of chimney 100 m made of bricks for ČEZ, a.s. Heating Plant
Dvůr Králové, new protective ceramic liner
- reconstruction of flue ducts of chimney 270 m - ČEZ, a.s. ETU
II, for Chiyoda Japan
-revision of more than 200 chimneys in the Czech Republic, including
the highest ones (300 m Chvaletice, Dětmarovice, 270 m -Mělník,
etc.)
-erection of a new chimney 140 m for ABB Power Systems Brno for
Power Station Mělník I
- erection of two pcs of silos for storing gypsum 30 m for ABB Power
Systems Brno for Power Station Mělník I
- linings with fibre containing material for exhaust of throat
gases I for Moning Týniště n. Orlicí, Orsil, a.s. Častolovice
- general overhaul of linings of boilers K21, K23, K22, K24, K23
for RRK Kadaň - Power Plant Tušimice II
- general overhaul of linings of boiler K9 - Koramo Kolín
- lining of reducing furnace for porcelain firing - Karlovarský
Porcelán - Lubenec
- dismantling and assembling of linings and insulating of convection
H1 - Paramo Pardubice
- general overhaul of tunnel rotary furnace for Mipoterm - Cement
Plant Čížkovice
- lining of boilers - Masospol Praha - Písnice
- general overhaul of furnace K2 for production of fritted glass
- Galzura, a.s. Roudnice n.L.
- lining of 2 pcs of boilers - Heating Plant Brandl Jablobec n.
Nisou
- reapir of linings of incinerator furnace for Schiestl, s.r.o.
- Elektromex Vyškov
- repair of linings of incinerator furnace for Schiestl, s.r.o.
- Emseko Otrokovice
- repair of lining of boiler - Sázavan Zruč n. Sázavan
- erection of tunnel furnace for firing of colouring substances,
33 m in lenght - Glazura, a.s. Roudnice n.L. "turn key" delivery
- lining of 8O pcs of kiln cars for TPP Olomouc - brick factory
Lety
- remodelling and lenghtening of brick kiln for Teplotechna Domažlice
- brick factory Lety
- general overhaul of boiler - Aroma Židovice
- lining of boilers - OD Kotva Praha
- lining of 90 pcs of kiln cars for TPP Olomouc - brick factory
Čičenice
- remodelling and lenghtening of brick kiln for Teplotechna Domažlice
- brick factory Čičenice
- lining of 27 pcs of kiln cars - Galzura, a.s. Roudnice n.L.
- supply and assembly of technological equipment for utilization
of waste heat - Glazura, Ltd Roudnice n.L.
- general ovverhaul of 11 pcs of kiln cars - Glazura, Ltd Roudnice
n.L.
- lining of bell furnaces for Chemiterm Praha - NH Technika Ostrava
- repair of linings and insulation of reduction furnace - ČKD Kutná
Hora
- linings with fibre material of exhaust of throat gases II for
Moning Týniště n. Orlicí - Orsil, a.s. Častolovice
- general overhaul of 38 pcs od kiln cars - Glazura, Ltd Roudnice
n.L.
- linings of roasting kiln for Remigas Praha - Orion Praha
- repair of linings of shaft kiln for lime firing - Sugar Factory
Mělník
- lining of 5 pcs of kiln cars in brick factory Novosedly - Ewienerberger,
brick producing industry
Maintenance of concrete shells
|
Selected maintenance works performed by the company F.P.S. ARCO,
Ltd. using suitable technological procedure (washing concrete surfice
as deep as to the firm core, blasting and anticorrosion protection
of reinforcement, refilling to original shape or guniting of the
total surface in case of enormous decomposition, secondary protection
including colour accommodation eventually):
- maintenance of inner and outer mantel of cooling tower - VCHZ
Synthezia Semtín
- maintenance of column foundations of neurological center in Dukovany
- Excon, a.s.
- general overhaul of chimney including maintenance of stack 59
m - Sugar Plant Žatec
- general overhaul of chimney including maintenance of stack 120
m Technoplast Chropyně
- maintenance of chimney liner 100 m - Cement factory Prachovice
- maintenance of supporting elements of block of flats - Praha 9,
Vysočany - Excon, a.s.
- general overhaul of chimney inluding maintenance of stack 85 m
after a crash - Heating Plant Malešice
- repair of outer mantel of reinforced concrete monolithic chimney
100 m - Power Plant Tisová
- general overhaul of chimney including maintenance of stack 100
m Power Plant Pardubice
- maintenance of bridge supports for JHP Praha - Kladno - Sítná
- maintenance of the upper section of liner and chimney mantel -
Optimit Odry
- maintenance of bridge supports No.1 for JHP Praha - Buštěhrad
- Koníčkův mlýn
- maintenance of foundations of assembled chimneys - Pražská teplárenská,
a.s.
- maintenance of 2 pcs of reservoirs for waste water from sand filters
- Teplárna Plzeň
- maintenance of bridge supports No.2 for JHP Praha - Buštěhrad
- Koníčkův mlýn
- general overhaul of chimney including maintenance of stack 120
m - type Monnoyer - JIP Větřní
-general overhaul of chimney including maintenance of stack 100
m - Brno, Špitálka
- maintenance of carrying elements of blocks of flats (preservation
of monuments) for K.O. Velkon, a.s. Praha 3, Na Parukářce
- maintenance of 3 pcs of reinforced concrete reservoirs for JHP
Praha - running shed Praha, Vršovice
- maintenance of weathered rock massif for ČEZ, a.s. Trutnov, Poříčí
- Heating Plant Náchod
- maintenance of 3 pcs of reservoirs for waste water in chemical
water treatment plant for S-profess Chomutov - Vřesová, Sokolovská
uhelná, a.s.
- maintenance of reinforced concrete skeleton and balconies of panel
building for Sapol Heřmanův Městec - Praha 9, Bílinská street
- maintenance of reinforced concrete structure of transformer station
for S-profess Chomutov - Sokolovská uhelná, a.s.
Works for Civil Engineering
|
- subsupply of building and assembling works for erection of platforms
for oil recovery for Gleitbau,GmbH Salzburg
- Norwegian Constructors - Stavanger, Norway
- reconstruction of block of flats for Excon, a.s. - Praha 9, Sokolovská
street
- supply and execution of flue dust collector on "turn key" base
- Sugar refinary Žatec
- manufacturing and supply of 80 pcs of steel containers for Gleitbau,
GmbH Salzburg - Stavanger, Norway
- supply and assembling of device for utilization of waste heat
on "turn key" base for Glazura, Ltd, Roudnice n.L.
- erection of block of flats (11 houses, 28 flats + nondwelling
rooms) - Praha 4, Nové Dvory
- erection of 10 pcs of reinforced concrete masts for aerial system
R + M SI Praha - Radiomobil
- water-proof reinforced concrete flooring between steel girders
of the building for draining of gypsum silos including sealing of
joints steel-concrete for ABB Power Systems Brno - Power Station
Mělník I
- erection of building for belt transport of gypsum for ABB Power
Systems Brno - Power Station Mělník I
- thermal insulation of panel building for Sugar Refinary Mělník
in Neratovice
- reconstruction of block of flats for Regis Praha - Praha 1, Opletalova
street
- painting of lower ceilings of concrete structure of building for
draining in uneasily accessible spots over silos , for ABB Power
Systems Brno, Power Station Mělník I
- execution of special coating of 2 pcs of silos for gypsum for
ABB Power Systems Brno, Power Station Mělník I
- thermal insulation of boiler house - OLÚ Na Pleši , Nová ves p.
Pleší
- installation of floor covering - hotel Relax Monínec
- assembling of suspended sewerage of building for draining gypsum
silos for ABB Power Systems Brno, Power Station Mělník I
- measuring of vibration of gypsum silos and building for draining,
for ABB Power Systems Brno, Power Station Mělník I
|